How Vertical Mill Machine Operate?

How vertical mill machine operate?
1. Start up vertical mill machine

2. Turn on main switch

3. Start air compressor, adjust air pressure of oil-water filter to 0.6-0.7 Pa.

4. Turn on bag filter pulse controller, adjust the pulse frequency to one spray every 4-5 seconds, adjust pulse width to 0.5-0.8 seconds (pulse controller was set before delivery)

5. Switch on bucket elevator

6. Start up crusher

7. Feed materials to the crusher till enough crushed materials are sent to the hopper, and then start the classifier. (The rotation speed is subject to the finished fineness required by customers. Usually, 100 r.m.p similar corresponds to 100meshes; please see the following adjusting method of VVVF/VFD)
 
Clirik is a pioneer enterprise, which is specializing in research, manufacture and sales of all kinds of vertical stone grinding mill. Our company has already formed a full set of modern production line, equipped with intelligent, standardized testing and controlling laboratories, owned a professional team for R&D, production, sales and service. CLIRIK has been the biggest vertical mill manufacturer of East China.
 
So far, we have established a whole production chain, the products cover three rings mill, vertical stone grinding mill, vertical mill machine, micronization equipment and so on.
They are widely used in the industry of mining, construction materials, chemicals, metallurgy, transportation, hydraulic engineering and so on. Specially we independently developed HGM micro powder grinding mill, which are not only renowned in domestic market, but also have been sold widely in Eastern Europe, Middle East, Africa, South Asia, Oceania, and America, etc.