Vertical Mill Machine Test after Installment
After purchasing
vertical stone grinding mill machine, the manufacturer will send professional staff to install and debug the equipment. Before installation, you should guarantee the integrity of the equipment. The first step is to install the mill machine in the cement foundation, use foot screws to settle it on land.
When the machine is successfully installed, Shanghai Clirik Machinery Co.,LTD professional staff will help with debugging the machine with no load. Before the test, the roller in the equipment should be fasted by wire seizing. Avoid direct impact between grinding roller and grinding ring. The main body should run more than 1 hour with no load.
During its work, the oil temperature shall not exceed 80 ℃. Blower should start up with no load. Load step by step after working normally. And then observe its smooth operation, no abnormal noise and vibration. The highest temperature of rolling bearings must not exceed 70 ℃. The temperature rise shall not exceed 35 ℃; Load operation commissioning time should be no less than eight hours. When the machine works normally, it should have no noise and no leak in the pipe joint. Put the screw tightly, the machine can be put into normal use.
What is likely to affect the working efficiency of the mill machine?
The composition, hardness and wear resistance of different mineral is different, these factors will influence on grinding efficiency.
Performance of mill equipment will affects the grinding efficiency.
Worker operation can also be influencial. The structure of equipment is very complex. In the
vertical mill production line, workers must be in strict with the instructions to the operation; otherwise it will affect the normal operation of the mill machine.